PREVENTIVE MAINTENANCE
Plan the care. Reduce the uncertainty.
A maintenance scope built around the equipment, manufacturer guidance, site conditions and operating history.
Discuss your maintenance requirement
A STRUCTURED APPROACH
Understand.
Act. Verify.
Know the asset
Identify the panel, its components and available history. Review recurring defects, environmental exposure and the consequences of an interruption.
Define the maintenance plan
Use the installed equipment’s instructions to agree inspection, servicing and testing. Select intervals around the duty and condition of the asset.
Prepare the shutdown
Agree access, isolation responsibilities, competence, spares and the sequence for completing work and restoring service.
Record what changed
Document completed checks, defects, replaced items and follow-up recommendations. Use the findings to inform the next maintenance review.
BEFORE WE BEGIN
Prepare for
a useful assessment.
- Asset list and previous reports
- Manufacturer maintenance instructions
- Shutdown window, critical loads and spares information
A record you can use.
A clear maintenance record and prioritised follow-up actions for the equipment included in the agreed scope.
Maintenance guidanceYOUR NEXT CONNECTION
Let’s plan the work around your panel.
A panel that needs attention. A component you need to find. Start a conversation with Corevolt.